Current Projects 355 Projects

Customised reports can be made using search register function
# Project Name Project Number Project Area (ha) Proponent Offset Info
41 Clearing for project activities throughout the southwest of Western Australia for Western Power's 'South West Interconnected System' transmission network (north to Kalbarri, east to Kalgoorlie and south to Ravensthorpe). 1918/9 0.0 Electricity Networks Corporation, trading as Western Power
Offset Type Offset Area (ha) Status
Other 0.0 Current
42 Clearing of 4.2 hectares of native vegetation for the purpose of upgrading Ocean Reef Road 1964/2 4.2 City of Wanneroo
Offset Type Offset Area (ha) Status
Rehabilitation 8.4 Current
43 Clearing of 0.152 hectares of native vegetation for the purpose of a pedestrian pathway and boardwalk on Lot 612 on Plan 10292, Lot 12835 on Plan 21310 (Reserve 45385) and Compass Circle road reserve, Yanchep. 1974/5 0.152 City of Wanneroo
Offset Type Offset Area (ha) Status
Rehabilitation 0.547 Current
44 Realignment and widening of Brazier Road, Yanchep. 2184/3 1.188 City of Wanneroo
Offset Type Offset Area (ha) Status
Rehabilitation 2.37 Current
45 Clearing of 10 hectares of native vegetation for the purpose of fenceline construction and maintenance in the Shires of Goomalling and Wongan-Ballidu. 2418/2 10.0 Jameson Farm Pty Ltd
Offset Type Offset Area (ha) Status
Other None Current
46 Limestone Resources Australia Pty Ltd has applied to clear up to 6.4 hectares of native vegetation for the expansion of limestone mining operations. The proposal involves clearing approximately 1.8 hectares of vegetation community LWBa and approximately 4.6 hectares of TOSBsOSXp. Vegetation and topsoil will be cleared using a bulldozer, and stockpiled for later use in rehabilitation activities (Landform Research, 2008). Vegetation and topsoil will be cleared using a bulldozer, and stockpiled for later use in rehabilitation activities (Limestone Building Block Company, 2009). 2858/1 1.08 Limestone Resources Australia Pty Ltd
Offset Type Offset Area (ha) Status
Other 0.0 Current
47 Clearing of 29.72 hectares of native vegetation for the purpose of sand extraction on Lot M1448 on Diagram 6412 Lennard Brook. 2860/7 29.72 Hanson Construction Materials Pty Ltd
Offset Type Offset Area (ha) Status
Rehabilitation 5.26 Current
Rehabilitation 21.59 Current
48 Kununurra Heavy Vehicle Route Stage 1 2892/5 60.0 Commissioner of Main Roads Western Australia
Offset Type Offset Area (ha) Status
Land acquisition 67.0 Current
49 Clearing of 109 hectares of native vegetation for the purpose of horticulture in the Shire of Gingin. 2926/4 109.0 North East Equity Pty Ltd
Offset Type Offset Area (ha) Status
Onground management 215.0 Current
Land acquisition 27.0 Complete
50 Clearing of 10.51 hectares of native vegetation for the purpose of upgrading Ocean Reef Road 2963/1 10.51 City of Wanneroo
Offset Type Offset Area (ha) Status
Rehabilitation 2.0 Current